Inspection criteria is the same as a 12 month inspection, with the addition of in-line load testing of all swaged / swageless terminations.
According to Australian Standards, on the 10th year of service a full test on the swaged ends needs to be carried out for any connections on the static line system.
Please visit our FAQ – How often do I have to recertify my static lines? – and watch Murray’s video for more details.